Total installation

Ground-Mounted
Ground-Mounted
319.6 MW
Floating solar system
Floating solar system
17 MW
Rooftop
Rooftop
184.8 MW
  • MOMO
    MOMO
    PV capacity: 0.988 MW
    Position: Taoyuan
  • Applied Materials Taiwan
    Applied Materials Taiwan
    PV capacity: 0.50 MW
    Position: Tainan
  • Winbond Central Taiwan Science Park plant
    Winbond Central Taiwan Science Park plant
    PV capacity: 0.50 MW
    Position: Taichung
  • 3M plant
    3M plant
    PV capacity: 0.50 MW
    Position: Tainan
  • Aerospace Industrial Development Corporation
    Aerospace Industrial Development Corporation
    PV capacity: 2.49 MW
    Position: Taichung
  • Corning Group
    Corning Group
    PV capacity: 2.50 MW
    Position: Taichung/Tainan
  • Heng I Chemical
    Heng I Chemical
    PV capacity: 0.50 MW
    Position: Miaoli
  • DongYuan Solar Stadium
    DongYuan Solar Stadium
    PV capacity:0.468 MW
    Location: Tainan
  • AUO Museum of Sidadun Kiln (completely powered by green energy)
    AUO Museum of Sidadun Kiln (completely powered by green energy)
    PV capacity: 0.047 MW
    Location: Taichung
  • San Fu Chemical
    San Fu Chemical
    PV capacity:0.486 MW
    Location: Tainan